Post-Construction Requirements

Post-Construction storm water management requires the implementation and design of measures to treat storm water before it discharges into the municipal storm water system. The City has created post-construction standards and guidelines for storm water runoff. These standards apply to both new development and re-development projects.

The City has developed a storm water technical guide to assist in complying with these post-construction standards.

King City Stormwater Technical Guide